I agree to a point.... however
If I am pulling the last 2 pages of the DOT for faxbacks then I will put all 16 pgs of the DOT back together and in order. However, I doubt I would try to remember that the DOT was behind the 42nd page of the package. I was once told by a processor that she did not care about the order as long as all the pages of a certin doc (HUD, NOTE....) were together. Her reasoning was that she had to reorder the docs in a folder for the LO anyway. Besides, many times the e-docs are in 2 or more emails..... Does the title stuff go before the loan docs or after? Does it really matter?
I always put the HUD and RTC on top of the package anyway.... |